Continuous heavy rainfalls over the last two days in the Laza village of Gabala have caused serious damage to the road leading to the settlement.
The strong flood passing through the Demirparan stream in Gabala has rendered part of the road completely unusable.
Employees of the Gabala Water Melioration Systems Operation have inspected the area and measures are being taken to eliminate the problem as soon as possible.
The strong flood passing through the Demirparan stream in Gabala has rendered part of the road completely unusable.
Employees of the Gabala Water Melioration Systems Operation have inspected the area and measures are being taken to eliminate the problem as soon as possible.
