The construction of the Fuzuli-Hadrut highway, one of the road infrastructure projects implemented in the Karabakh and East Zangazur economic regions and playing an important role in the socio-economic development of the liberated Azerbaijani territories, continues at a rapid pace and is at the final stage.
The length of the four-lane highway is 12 kilometers, the width of the carriageway is 14 meters.
The I technical class road originates from the Victory Road and connects with the newly built Shukurbayli-Jabrayil-Hadrut highway.
The Fuzuli-Hadrut highway passes through the territory of the Fuzuli and Khojavand districts liberated from occupation.